Estimators consistently confuse two Florida wind zones: the High-Velocity Hurricane Zone (HVHZ) and the wind-borne debris region (WBDR). They overlap on the coast and both demand impact protection, but they come from different codes, accept different tests, and approve different products. Get them mixed up and you either overpay for Miami-Dade-grade product on a WBDR job — or submit a WBDR-only product in Miami-Dade and get it rejected.

Two zones, two sources

Before the rest of this post, pin down the two terms it leans on — they come from two different places.

  • HVHZ (High-Velocity Hurricane Zone) is Florida’s own. It exists only in the FBC: §1620 sets its wind loads and §1626 its impact tests, and it covers Miami-Dade and Broward — nothing else. Every address in those two counties is inside it; every address outside is not.
  • WBDR (Wind-Borne Debris Region) is a national concept. It is defined in ASCE 7-22 §26.12.3 and carried through the ICC model codes, which the FBC adopts. It covers areas within one mile of the coastal mean high-water line where the design wind speed is 130 mph or greater, plus any location at 140 mph or greater.

The split that matters: the HVHZ is Florida adding a stricter layer on top of the national WBDR — not a synonym for it.

Here is the short version, then the detail.

Stylized 3D map of Florida with Miami-Dade and Broward glowing neon lime-green on a deep navy background

The short version

Three things change when a project crosses out of the HVHZ:

  1. Design wind speed. Inside the zone, the code fixes the velocity by county and risk category — 175 mph for Miami-Dade and 170 mph for Broward at Risk Category II, higher at III and IV. Outside, you pull the speed from the ASCE 7-22 wind-speed maps and run Chapters 26 through 31 of ASCE 7 the same way every other state does.
  2. Impact testing. Inside the zone, envelope components must pass the Miami-Dade TAS protocols. Outside, a product tested to ASTM E1886/E1996 is also accepted — as long as the site sits in a wind-borne debris region (WBDR), and most of coastal Florida does.
  3. Product approval. The Miami-Dade NOA is a county document. Outside the two HVHZ counties, the statewide Florida Product Approval carries the project, and it does not have to be NOA-grade unless the jurisdiction says otherwise.

Where the HVHZ boundary actually sits

FBC Section 1620.1 sends HVHZ buildings to Chapters 26 through 31 of ASCE 7 for wind design. Section 1620.2 then fixes the 3-second-gust design velocity that governs:

Risk Category Miami-Dade Broward
I 165 mph 156 mph
II 175 mph 170 mph
III and IV 186 mph 180 mph

Section 1620.3 adds a default Exposure Category C unless D applies. There is no site-specific wind study that lowers these numbers. They are statutory.

Outside the zone, the same ASCE 7 chapters govern, but the input changes: you read the basic wind speed from the ASCE 7-22 maps, adjust for exposure, and compute components and cladding pressures from the standard’s tables and equations. A coastal Palm Beach or Collier parcel can still land in the 160 to 180 mph range — the arithmetic is the difference. That is why you cannot carry a Miami-Dade design pressure north and expect it to hold; on many openings it will be conservative, and on some it will not. Run the number, don’t port it. The mechanics of reading design pressure requirements still apply word for word — only the input changes.

Impact protection: TAS-only vs. TAS-or-ASTM

The region-by-region answer to “which tests are acceptable”:

Region Acceptable impact tests Approval document
HVHZ — Miami-Dade & Broward TAS 201 / 202 / 203 only Miami-Dade NOA
WBDR — non-HVHZ impact zone TAS, ASTM E1886/E1996, or AAMA 506 Florida Product Approval (FL#)
Standard — no impact required none —

And the carry-over that trips orders up runs in one direction only:

A device approved to ASTM or AAMA alone does not carry into the HVHZ. It clears the WBDR bar, but Miami-Dade and Broward require the Miami-Dade TAS series on a Miami-Dade NOA — so a shutter, impact window, or door that passed only ASTM E1886/E1996 is accepted on the Gulf coast and rejected at the county line. The reverse does carry: a NOA product is accepted everywhere in the state.

Inside the HVHZ, FBC Section 1626.1 requires every part of the building envelope — walls, roof, doors, skylights, glazing, glass block — to meet impact test criteria or be protected by a device that does. The test procedures are the Miami-Dade TAS series: TAS 201 for missile impact (large and small), TAS 202 for uniform static air pressure, TAS 203 for cyclic wind pressure. If you are new to the three, read the breakdown of TAS 201, 202, and 203 before ordering product.

Outside the HVHZ, the trigger is the WBDR introduced above. In a WBDR, FBC Section 1609.1.2 requires glazed openings to be impact resistant or protected — and the acceptable test standards expand to include AAMA 506 and ASTM E1886/E1996 alongside TAS.

Two details worth keeping straight:

  • Missile size still depends on height. FBC 1609.1.2: glazed openings within 30 feet of grade meet the large-missile test; openings above 30 feet meet the small-missile test. The principle your submittal reviewers apply on a Miami high-rise is the same one applied on a Naples mid-rise — the approved missile tier drops with elevation.
  • The WBDR covers most, not all, of Florida. Inland parcels below 140 mph and past the one-mile coastal band are outside it, and impact protection is not required there — though many owners still spec it for insurance and resilience. Know which side your site is on before you let a supplier talk you into a premium assembly you may not need, and do not let them tell you a WBDR project is exempt.

Product approval: NOA vs. the state system

The difference between a Miami-Dade NOA and a Florida Product Approval is jurisdictional, not technical. The NOA is issued by Miami-Dade County and certifies the TAS testing its own reviewers require. The Florida Product Approval is the statewide system under the Florida Building Commission.

What changes outside the zone:

  • Miami-Dade: products need a current NOA covering the exact assembly, substrate, and pressure.
  • Broward: still HVHZ — same wind speeds and TAS testing culture, but as a practical matter projects here are routinely carried on Florida Product Approvals that state HVHZ coverage. Read the approval’s coverage section before relying on it.
  • Non-HVHZ Florida: the FL# approval is the document of record, and ASTM-tested products are eligible. The NOA has no force there.

The trap that costs a submittal week: an FL# that does not state HVHZ coverage submitted on a Broward job, or a NOA-grade product specified for a non-HVHZ project when a cheaper ASTM-tested equivalent was already approved for the same opening. Check the approval’s stated coverage, not just the number. The verification procedure used for a Miami-Dade NOA carries over to any jurisdiction — the fields are the same, the issuing authority is what differs.

Exceptions that only exist outside the zone

Non-HVHZ projects inherit a set of WBDR exceptions that have no analog in Miami-Dade and Broward:

  • Plywood panels. FBC 1609.1.2, Exception 1: 7/16-inch wood structural panels, precut, with permanent anchorage, may protect openings on Group R-3/R-4 buildings with a mean roof height of 33 feet or less where Vult is 180 mph or less — span between fastener lines capped at 44 inches. Inside the zone, the impact criteria do not fold.
  • Height relief. Glazing more than 60 feet above grade, and more than 30 feet above aggregate-surface roofs within 1,500 feet, may be unprotected (Risk II, III, IV). In the HVHZ, the envelope requirement in Section 1626 has no height carve-out.
  • Risk Category I. Glazing on Risk Category I buildings — limited-occupancy storage, for example — may be unprotected in a WBDR. Not in the zone.

None of that is legal advice about a specific project — the AHJ decides how the exceptions apply to your drawings. But it explains why a submittal package that is airtight in Miami is overbuilt on the Gulf coast, and why a package that is legal in Naples is not worth submitting in Broward.

What this means for your takeoff

When a job crosses the HVHZ line, do not reuse the last Miami package. Rebuild it from these four questions:

  1. Is the site in a wind-borne debris region? One-mile band and 140 mph map check.
  2. What is the mapped basic wind speed, and what does that produce for components and cladding at this opening?
  3. Which test standard does the proposed product carry — TAS, AAMA 506, or ASTM E1886/E1996 — and does the approval cover the assembly and pressure?
  4. Do any of the WBDR exceptions legitimately apply?

That is exactly the kind of jurisdiction-by-jurisdiction comparison that what the EnergyCheck team delivers — a dedicated compliance pass that checks approval coverage, pressure, and substrate against the drawing set, in the county where the building actually gets built.

The window is often the same model. The submittal rarely is.